— 31 —
2-5. BASE UNIT (MBU-2B6P), LOADING MOTOR ASSEMBLY
1
Screw (+BVTP3x6)
4
Belt (BD)
5
Two screws (+B2.6x5)
6
Connector (CN192)
7
Loading motor assembly
3
MD base unit (MBU-2B6P)
2-6. SLIDER ASSEMBLY MOUNTING
1
Set the four left and right projections of
lever to the position as in the figure.
2
Rotate fully the lever (SLM)
in arrow direction
A
.
4
Move the slider assembly in arrow direction
B
, and lock it to the lever (SLM).
3
Rotate the pully (BD)
in arrow
C
direction.
A
B
C
2
Two screws
(+BVTP3x6)
Summary of Contents for MDS-B6P
Page 2: ... 2 ...
Page 5: ... 5 SECTION 1 GENERAL This section is extracted from instruction manual ...
Page 6: ... 6 ...
Page 7: ... 7 ...
Page 8: ... 8 ...
Page 9: ... 9 ...
Page 10: ... 10 ...
Page 11: ... 11 ...
Page 12: ... 12 ...
Page 13: ... 13 ...
Page 14: ... 14 ...
Page 15: ... 15 ...
Page 16: ... 16 ...
Page 17: ... 17 ...
Page 18: ... 18 ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 ...
Page 23: ... 23 ...
Page 24: ... 24 ...
Page 25: ... 25 ...
Page 26: ... 26 ...
Page 27: ... 27 ...
Page 28: ... 28 ...
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......