PAM-200
Installation Manual
Page - 7 -
Safety Warning
WARNING
: Both M4 x 12mm security screws (located on each side of the mount) must be tightened
securely before installation is complete. If the M4 x 12mm screws are not properly
secured, there will be an increased risk of attachment failure, which could result in
damage to the projector.
Concrete Mounting
NOTE
:
The PAM-200 can be mounted to a ceiling with a minimum 6” thickness. Concrete wedge anchors must be used for
concrete installation. It is recommended that ¼” wedge anchors be used. A 5/16” masonry bit must be used to drill the pilot
hole. These items can be purchased at your local hardware store.
1. Begin by placing the ceiling plate into position against the ceiling, keeping it level.
2. Mark off four holes to be used for securing the mount and place the ceiling plate aside.
3. Next, drill holes using the appropriate masonry bit for your anchor.
4. Insert a concrete anchor into each hole.
5. If necessary, a hammer can be used to lightly tap each anchor into place so that they are flush with the ceiling.
6. Once all of the anchors are in place, move the ceiling plate back into position.
7. Attach the nut onto the threaded shaft that is protruding from the ceiling.
8. Do not tighten until all nuts are in place.
Technical Specifications
All measurements are inches (mm).
M4 x 12mm
Security Screw