4.
Remove the three screws to detach the SWC-56 board.
P2 x 4
CN102
Harness
SWC-56 board
5.
Remove the screw (TP2 x 5) and the three screws (P2 x 4) and lift up the EC-78 board in the direction of the arrow
A.
6.
Remove the SxS escutcheon assembly in the direction of the arrow B.
SxS escutcheon assembly
EC-78 board
A
B
P2 x 4
TP2 x 5
7.
Install the removed parts by reversing the steps of removal.
PMW-300
2-30