2-11
2-4-9 Gear Loading Drive, Slider Cam,
Ass’y Lever Load S, T Removal
1) Remove the Belt Pulley. (Refer to Fig. 2-38)
2) Remove the Gear Loading Drive
1
after releasing Hook [A] in
the direction arrow as shown in detail drawing.
3) Remove the Slider Cam
2
.
4) Remove the Ass’y Lever Load S
3
& Ass’y Lever Load T
4
.
Fig. 2-21 Gear Loading Drive, Slider Cam,
Ass’y Lever T, S Load Removal
2-4-10 Gear Loading Drive, Slider Cam,
Ass’y Lever Load S, T Assembly
1) When reinstalling, be sure to align dot of Ass’y Lever Load T
1
with dot of Ass’y Lever Load S
2
as shown in drawing,
(Refer to Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam
3
hole,
3) Be sure to align dot of Ass’y Lever Load T
1
and dot of Gear
Loading Drive
4
, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive
4
with mark of Slider Cam
3
as shown in drawing (Refer to Timing Point 3).
Fig. 2-22 Gear Loading Drive, Slider Cam,
Ass’y Lever Load S, T Assembly
2
LEVER LOAD S
1
LEVER LOAD T
PIN A
PIN C
PIN B
PIN D
3
SLIDER CAM
TIMING POINT 2
TIMING POINT 1
TIMING POINT 3
HOOK(A)
1
GEAR LOADING DRIVE
2
SLIDE CAM
4
ASS'Y LEVER LOAD T
3
ASS'Y LEVER
LOAD S
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299