–
26
–
KV
-XS29N90/XS29N93
RM-914
2-9. TERMINAL BRACKET REMOVAL
One screw
(+BVTP 3
×
12)
Two screws
(+BVTP 3
×
12)
Two screws
(+BVTP 3
×
12)
2
Two claws
3
Terminal bracket
3
Two screws
(+BVTP 3
×
12)
PWB holder
J4 Board
(KV-XS29N93 only)
7
5
6
2-8. D3 BOARD REMOVAL
1
Three connectors
2
One claw
3
D3 board
2-10. B5 and B7 BOARDS REMOVAL
B7 board
B5 board
1
One claw
2-11. H5 BOARD REMOVAL
3
Two connectors
6
One screw (+BVTP 3
×
12 with washer)
1
Two connectors
4
Four claws
5
H5 Board
2
Four connectors