2-5 (E)
UYA-S90SF
Stepping motor
SE-563 board
SE-562 board
SE-561 board
CN-1959 board
Plate rock assembly
BTP 2
x
5
BTP 2
x
5
Roller shaft (A) assembly
Main roller
Lid
2-1-4. Cleaning/Replacement of Main Roller
(1) Remove the lid, then pull out the roller shaft (A)
assembly.
(2) Remove the main roller in the direction indicated by
the arrow.
(3) Clean the main roller with a cleaning cloth moistended
with cleaning liquid.
(4) Attach a new main roller in the reverse order of steps
(1) and (2).
2-2. Carrier Assembly
2-2-1. Main Parts Location
2-2-2. Replacement of Main Parts
1. Removal of Plate Rock Assembly
Remove the eight screws, then remove the plate rock
assembly.