6.2
NOTE
•
Do the adjustment on the flat surface.
1.
See the pressure gauge (D), the pressure gauge should be 1000 PSI / 6895 KPa .
2.
Connect the grease gun (C) to the filling hose connector. (Use grease Shell Gadus SE V220C NLGL1)
3.
Connect the filling hose connector (E) on the male coupler of the hydraulic system module (2).
4.
Activate the grease gun mechanism (F). At this moment the pressure in the hydraulic system increases.
5.
When the pressure reaches 1100 PSI / 7585 KPa on the pressure gauge (D), wait 30 second and see the pressure
a seconde time.
6.
Remove the filling hose (E) and the grease gun (C).
7.
Repeat previous steps for the opposite side.
8.
When all systems are adjusted to the right pressure, check each hydraulic module to ensure there are no leakage.
9.
Verify the hydraulic grease level of both modules if necessary.
SOUCY TRACK SYSTEMS USER GUIDE
A-8J1201-7-EN
43
Summary of Contents for S-TECH 1000X
Page 10: ...Page Intentionally Left Blank SOUCY TRACK SYSTEMS USER GUIDE A 8J1201 7 EN 6...
Page 14: ...Page Intentionally Left Blank SOUCY TRACK SYSTEMS USER GUIDE A 8J1201 7 EN 10...
Page 52: ...Page Intentionally Left Blank SOUCY TRACK SYSTEMS USER GUIDE A 8J1201 7 EN 48...
Page 68: ...Page Intentionally Left Blank SOUCY TRACK SYSTEMS USER GUIDE A 8J1201 7 EN 64...