- Page 2 -
3. INSTALLATION REQUIREMENTS
After unpacking the equipment, the following guide should assist you in achieving a
trouble free installation.
3.1
MINIJOOK
Place the Minijook in the position in which it will be finally installed.
Ensure the location is dry and the equipment is set level.
There must be a mains supply socket within two metres of the equipment.
Measure the mains supply to ensure it is 230V a.c. If the supply is less than
the recommended voltage level stated please contact your local generating
board for advice.
We recommend an earth continuity test is carried out on the mains supply socket
prior to use.
Unscrew the two transit securing bolts located one at each side of the play
mechanism. These bolts should be unscrewed and withdrawn complete.
NOTE: We would like to bring to your attention that, since 1992, portable
appliance testing is required and a certificate of compliance issued.
3.2
WALLBOX
Firmly affix the wallbox hanging bracket so that on completion the coin input slot
is at a height that can be reached with ease.
The wallbox, once hung on the bracket, is anchored with two bolts.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
The holes in the wallbox are oversized to facilitate its levelling.
Summary of Contents for Mini Jook
Page 4: ......