-14-
For Machines Mfd. Since 12/21
South Bend Tools
Model SB1007
P R E P A R A T I O N
Preparation Overview Required for Setup
The items listed below are required to
successfully set up and prepare this lathe for
operation.
For Lifting
• A forklift or other power lifting device rated
for the weight of the lathe.
• Lifting
slings (rated for at least 750 lbs.
each).
For Power Connection
• A power source that meets the minimum
circuit requirements for this lathe. (Refer to
Power Supply Requirements section for
details.)
• A qualified electrician to ensure a safe and
code-compliant connection to the power
source.
For Assembly
• Cotton Rags
• Mineral Spirits
• Safety Glasses
• Quality Metal Protectant Oil
• Workbench/Stand Mounting Hardware (As
Needed)
• Precision Level
The purpose of the preparation section is to help
you prepare your lathe for operation. The list
below outlines the basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack
lathe and inventory contents of the
box/crate.
2.
Clean
lathe and its components.
3.
Identify an acceptable location for lathe and
move it to that location.
4.
Level
lathe and either bolt it to workbench or
stand.
5.
Assemble loose components and make any
necessary adjustments or inspections to
ensure lathe is ready for operation.
6. Ensure headstock and quick-change gearbox
are properly lubricated.
7.
Connect
lathe to power source.
8.
Test run lathe to make sure it functions
properly and is ready for operation.