-18-
For Machines Mfd. Since 11/20
South Bend Tools
Model SB1099
P R E P A R A T I O N
23.
Insert collection bag inside drum and fold
excess length of bag over lip of drum.
24.
Move collection drum under lid, then lift
drum lock handle to secure drum and seal
drum lid.
25.
While assistant holds canister filter under
housing assembly, attach canister filter to
housing with (6)
5
⁄
16
"-18 x
1
⁄
2
" flange bolts (see
Figure 21).
Figure
Figure 21. Canister filter attached to housing.
. Canister filter attached to housing.
19.
Attach (4) 2" swivel casters to collection
drum with (4)
5
⁄
16
"-18 hex nuts (see Figure
19).
20.
Adjust hex nuts and pre-installed flange
nuts (see Figure 19) until drum rolls evenly
without rocking or wobbling, then tighten
nuts to secure casters in place.
x6
x6
Canister
Canister
Filter
Filter
Figure
Figure 19. Swivel caster attachment to collection
. Swivel caster attachment to collection
drum.
drum.
Swivel
Swivel
Caster
Caster
Collection
Collection
Drum
Drum
Housing
Housing
21.
Attach handle to collection drum using (2)
1
⁄
4
"-20 x
5
⁄
8
" Phillips head screws and (2)
1
⁄
4
"-
20 acorn nuts (see Figure 20).
22.
Attach 1
1
⁄
2
" hose to hose port on collection
drum with 1
1
⁄
2
" hose clamp (see Figure 20).
Figure
Figure 20. Collection drum assembled and connected
. Collection drum assembled and connected
to dust hose.
to dust hose.
Collection
Collection
Drum
Drum
1
1
1
1
⁄⁄
2
2
" Dust
" Dust
Hose
Hose
26.
Attach lower alignment arm to top of
canister filter spindle and secure with M6-1
x 16 cap screw (see Figure 22).
Figure
Figure 22. Lower alignment arm attached to canister
. Lower alignment arm attached to canister
filter spindle.
filter spindle.
Lower
Lower
Alignment Arm
Alignment Arm
Canister
Canister
Filter Spindle
Filter Spindle
Hose
Hose
Port
Port
Handle
Handle
x2
x2