-14-
For Machines Mfd. Since 12/21
South Bend Tools
Model SB1102
P R E P A R A T I O N
HEAVY LIFT!
This machine and its parts
are heavy! Serious personal
injury may occur if safe
moving methods are not
used. To reduce the risk of
a lifting or dropping injury,
ask others for help and use
power equipment.
Assembly
This machine must be fully assembled before it
can be operated. Before beginning the assembly
process, refer to Required for Setup and gather
all listed items. To ensure the assembly process
goes smoothly, first clean any parts that are
covered or coated in heavy-duty rust preventative
(if applicable).
1.
Loosen pre-installed hex bolt, and remove
cardboard protection from base of control
panel pedestal.
2.
Carefully rotate control panel to upright
position and attach pedestal to side of
machine with (3)
3
⁄
8
"-16 x 2" hex bolts and
(3)
3
⁄
8
" flat washers, plus the hex bolt and
flat washer that was loosened in Step 1, as
shown in Figure 8.
To assemble machine:
Lifting & Placing
1.
Move machine near its prepared location
while still inside shipping crate.
2.
Remove top and sides of shipping crate, then
place small items aside in safe location.
3.
Unbolt machine from pallet.
4.
Carefully lift machine off pallet and move
it to prepared location, then lower machine
into position.
DO NOT attempt to lift or move machine without
using a forklift or necessary assistance from
other people.
Review the Power Supply section (Page 10)
and Location section (Page 13), then prepare a
permanent location for the machine.
IMPORTANT:
Make sure prepared location is
clean and level.
To lift and place machine:
Figure 8. Attaching control panel to machine base.
Figure 8. Attaching control panel to machine base.
Control
Control
Panel
Panel
Pedestal
Pedestal
x 4