PREPARATION
South Bend Tools
For Machines Mfd. Since 12/21
Model SB1102
-9-
P R E P A R A T I O N
Preparation Overview Required for Setup
For Assembly
• Additional Person for Moving
• Safety Glasses (for each person)
• Phillips Screwdriver #2
• Wrench or Socket
9
⁄
16
"
• Hex Wrench 5mm
• Open-Ended Wrench 12mm
• Double-Sided Tape
1
⁄
16
"
• Dust-Collection System
• 4" Dust Hoses (length as needed)
• 4" Hose Clamps
• 4" Y Adapter
The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines the basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the
machine and move it to that location.
4.
Level the machine and either bolt it to the
floor or place it on mounts.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it
functions properly and is ready for operation.
The following items are needed, but not included
for the setup/assembly of this machine.
For Power Connection
• A power supply that meets the minimum
circuit requirements for this machine. (Refer
to the Power Supply Requirements
section for details.)
Like all machinery there is potential danger
when operating this machine. Accidents are
frequently caused by lack of familiarity or
failure to pay attention. Use this machine with
respect and caution to decrease the risk of
operator injury. If normal safety precautions are
overlooked or ignored, serious personal injury
may occur.
For Lifting
• Forklift (Min. 750 lb. rating)