5
The rudder is articulated by a Scotch tape on the with dimensions right of the fixed plan. One can
also place a thread of silicone on the articulation to decrease the play
.
5. The fuselage
5.1 Installation of the sleeves of key of stab (Option stab with elevators only)
To make 1 small hard wood parallelepiped with dimension following: 50mm X 16mm X 15mm. To
sand the interior of the foot of rudder, with the height of the stab so that the adhesive hangs and
to stick to epoxy the small piece of wood by tightening the rudder with a greenhouse joint. To bore
2 holes of 3mm, through the rudder and wood, at the places indicated on the left side of the
rudder, by paying great attention to perpendicularity with the plan of the rudder. With the need to
use a drilling machine on foot and to fix the fuselage horizontally. To cut 2 brass tubes of 3mm to
the good length and to stick these sleeves, to the cyano, in the rudder.
3.5 cm
1.0 cm
1.0 cm
Bloc de bois dur
5.2 Passage of the control horns of stab
To be able to thread the stabs on the ground it is necessary to bore an enough large passage to
them to be able clipper the covers with balls since outside.
5.3 Installation of the sleeves of key of stab (pendular Option stab only)
To make 2 small hard wood parallelepiped with dimension following: 15mm X 15mm X 5mm. To
bore in their center with the diameter 3mm. To assemble the 2 pieces and the bevel gearbox with
a brass tube of 3mm of diameter and 18mm length while letting exceed the tube of 1mm of each
with dimensions. To boron well perpendicularly the holes before (3mm) with the level of the mark
one the left blank of the rudder transistor. To sand the interior of the foot of rudder transistor, with
the height of the stab so that the adhesive hangs. To stick to epoxy the small pieces of wood
assembled on the bevel gearbox by tightening the rudder with a greenhouse joint.