OPERATING INSTRUCT IONS
SECTION 5:
MODELS: GC-2 & GC-3
STEAM GENERATING PROCESS
Open left door of cabinet and turn ON power switch on face of Generator Control Box. Pilot light win
come on (green), burners will ignite and steam generating process will begin. After approximately 20
minutes, sufficient amount of pressurized steam will have been generated in the Boiler and the Cooker
is now ready for the Cooking Operation.
COOKING OPERATION
-If the appliance has been standing idle for a considerable length of time, the compartments will be cold
and must be pre-heated before commencing the Cooking Operation.
-Refer to Pan Selection and Time Schedules in Section 4.
-Turn Handwheel clockwise sufficiently to provide a good seal on gasket.
-Set Timer to desired cooking cycle.
-Pull out Operating Handle and set in position.
-Pilot light will indicate that cooking cycle is now in progress.
-Completion of the cooking cycle is indicated by the buzzer going on and the pilot light off.
-Set Operating Handle back and turn Handwheel fully counter-clockwise.
-Open door and remove food in pans.
CLEANING
At the end of each day turn appliance OFF. Remove pans and side racks from compartments. Remove
food sediment from compartment bottoms and wash compartment interior with mild detergent and rinse.
Never use steel wool on stainless steel equipment. Replace washed racks and shelves. Wash the
gasket sealing surface of compartment door daily with mild detergent to remove harmful food acids.
Turn Handwheel fully counter-clockwise to retract gasket plate into door to avoid pressure on gasket
when not in use.
CONTACT THE FACTORY, THE FACTORY REPRESENTATIVE OR A LOCAL
SERVICE COMPANY TO PERFORM MAINTENANCE AND REPAIRS SHOULD
THE APPLIANCE MALFUNCTION. REFER TO WARRANTY TERMS.
15
Summary of Contents for CQ-325S
Page 10: ...PERIODIC MAINTENANCE SECTION 4 MODELS GC 2 GC 3 FIG 2 SIDE VIEW 8 ...
Page 14: ...PERIODIC MAINTENANCE SECTION 4 MODELS 6C 2 GC 3 FIG 3 12 EXHAUST TO DRAIN STEAM IN ...
Page 25: ...PARTS LIST SECTION 7 COMPARTMENT DOOR ASSEMBLY FIG 4 23 ...
Page 28: ...PARTS LIST SECTION 7 COOKER ASSEMBLY FIG 5 25 ...
Page 30: ...PARTS LIST SECTION 7 COOKER CONTROLS FIG 6 27 ...
Page 32: ...PARTS LIST MODELS GC 2 GC 3 SECTION 7 CABINET FIG 7 29 ...
Page 34: ...PARTS LIST SECTION 7 MODELS GC 2 GC 3 GENERATOR CONTROL BOX ASSEMBLY FIG 8 31 OVERRIDE ...
Page 36: ...PARTS LIST SECTION 7 MODELS GC 2 GC 3 GDA 2 GHD 2 GENERATOR ASSEMBLY FIG 9 33 ...
Page 40: ...WIRING DIAGRAM 37 SECTION 8 MODELS GC 2 GC 3 ...
Page 41: ...WIRING DIAGRAM SECTION 8 MODEL GDA 2 38 ...
Page 42: ...WIRING DIAGRAM 39 SECTION 8 MODEL GHD 2 ...
Page 43: ...WIRING DIAGRAM MODELS EDA 2 SCDA 2 GDA 2 DDA 2 SECTION 9 SUPPLEMENT ...