Questions? Call Toll Free at 1-800-737-2112
6
Copyright © 2009 MAT Engine Technologies, LLC
Assembly
(Continued)
• Save all instructions
To Remove Tines
1. Remove the pins from each end of the tine shaft. Refer
to Figure 3.
2. Slide the four tines off the tine shaft.
To Install Tines
The 4 different tines are labeled “A”, “B”, “C”, and “D”. Refer
to Figure 4a for the location of the label.
For a 10” tilling width:
1. Assemble the tines as shown in Figure 4b. Make sure the
collars of the tines are facing each other.
2. Insert the pins into the holes at each end of the tine shaft
to lock the tines into place. See Figure 3.
For a 7” tilling width:
1. Only assemble tines B and C (the two inside tines). Do
not assemble tines A and D (the two outside tines). Refer
to figure 4b.
2. Insert the pins into the INSIDE holes of the tine shaft to
lock the tines into place. See Figure 5.
How to Assemble the Tines
Fig. 3
Pin
Fig. 5
Fig. 4a
D
C
B
A
Fig. 4b
Pin