2
Sectional Monopole Tower Foundation & Installation Manual, Revision A
Table of Contents
Important Safety Instructions ______________________________
3
PRIOR TO INSTALLATION _______________________________ 4
Introduction
_________________________________________
4
Building Permits & Zoning Requirements
________________
4
Installation Personnel
________________________________
5
Siting - Finding the Best Location for Skystream
__________
6-7
CONSTRUCTING THE FOUNDATION _____________________ 8
Foundation Drawings
_________________________________
8
Wind Zones
________________________________________
8
Soil Conditions
_____________________________________
9
Selecting A Foundation Configuration
___________________
10
Foundation Bolts & Templates (Pier & Mat Foundations)
___
10
Foundation Bolts & Templates (SMarT Foundation)
______ ___
10
Positioning the Foundations Bolts (Pier & Mat Foundations)
__
11-12
Positioning the Foundations Bolts (SMarT Foundation)
____
13
Electrical Conduit
____________________________________
13
Completing the Foundation
____________________________
13
TOWER INSTALLATION _________________________________ 14
Introduction
_________________________________________
14
Hinge Plate Installation
_______________________________
14-15
Gin Pole Installation
_________________________________
16
Sectional Monopole Tower Foundation
and Installation Manual
Document : 3-CMLT-1367-01
Revision: A
Raising the Tower
___________________________________
17-18
Adjusting Cable Length
______________________________
17-18
Lowering the Tower
__________________________________
19
Leveling the Tower
__________________________________
20
Tightening Foundation Bolts
__________________________
20
APPENDICES
Appendix A: 33.5 ft (10.2 m) Monopole Tower Foundations
Appendix B: 45 ft (13.7 m) Monopole Tower Foundations
Appendix C: SMarT Foundation Assembly and Drawings