2. Attach six solar panels to support rails as shown. Rails may need to
be adjusted depending on solar panel mounting hole locations. To
meet the requirements of the NEC article 690.43 (and the referenced
articles 250.134 or 250.136(A)), either wEEb ground washers or a
ground conductor or both (as required by your local AhJ and permit-
ting/inspection officials) must be used as well. Tighten all solar panel
and rail hardware when panels and rails are in the correct positions.
See Figures 13 & 14.
The Pv modules which came with your Skystream hybrid 6
TM
, and the
included Enphase micro-inverters, all have compatible Tyco Solarlok
connectors. The Pv module connectors simply plug into the Enphase
micro-inverter input connectors.
Install the two wEEbl ground lugs to the rails in the locations shown,
and route the ground cable (#6 Awg) as shown. See Figures 13 &
14 (detail A).
3. Connect and route the Enphase AC micro-inverter cable as shown in
Figure 13. Terminate the cable end with the Enphase branch terminator.
4. Mount a water resistant single gang junction box to use for the AC
connection from the Enphase Engage AC cable to the downtower
AC cable (which passes through the fitting you installed in the tower).
The junction box should be mounted to one of the solar panel support
rails. The size and type of box will vary depending upon local require-
ments, but a typical installation includes a readily-available single-gang
box as shown here:
Figure 14