2.
Position IR bud
overIRwindowofthedevicetobecontrolled.Removethebackingtoexposethe
adhesiveandsecurebudtoIRreceiverwindow.
Note
:Thebudadhesivegraduallysolidifiesand
quicklybecomesverystrong,makingrepositioningthebuddifficult.Besurethatthebudiscorrectly
placed.Theadhesivewillsolidifytomaximumstrengthinapproximately24hours.
Somedevicesareextremelysensitivetoprecisebudplacement.Ifpossible,programthePixiePro
andtesttheIRbudpositionbeforeaffixingthebudpermanentlywiththeadhesive.
UnlikesomeIRemitters,theopticfiberbuddoesnotilluminatewhenitsendssignal.AnLEDinside
theplasticassemblydoesvisiblyilluminate,andmaybeseenthroughtheblackplasticinthearea
labeled
IR Activity
.
3. Anchor IR bud
todisplaydevicewithincludedanchors.TheanchorswillholdtheIR budwirein
place.
4. Connect power supply
barrelconnectortoIRemitterterminalblockwiththeincluded6-VDC
powersupply.
Wiring Multiple IR Emitters
Wireeachadditional
PXE-EMIT
inparalleltothePixiePro.
Theymaybedaisy-chained,orwireddirectlyfromthePixiePro
inastarpattern.EachpositiononthePixieProcaptivescrew
terminalmustbewireddirectlytothecorrespondingposition
onthe
PXE-EMIT
assemblyasshowninthediagram.For
example,the
PXE-EMIT
positionl6Vmustbewiredto
thePixieProcaptivescrewterminalpositionlabeled
+6V
.
Note
:ThePixieProcandriveuptosixIRemitterswithasingle
powersupply.Todrivemorethansix,additionalpowersupplies
mustbeorderedseparately(partno.
PXE-DCM-PS
).
Affixemitterwith
Velcro™Tape
(included)
Guidewirewith
adhesiveanchors
ToPixiePro
8
3-conductorcable
Figure 8:
IRemitteraffixedtoaprojector
Figure 9:
Daisy-chainedIR
emitters(
PXE-EMIT
)