Setup
AD80
Verify that the facilities voltage matches the requirement for the machine. This
1.
information is printed on the serial tag on the rear of the machine.
Open the door on the AD80.
2.
Ensure the rocker power switch is in the OFF position. (
O
)
3.
Plug in the line cord.
4.
Power Switch (in OFF position)