Form 44201360
21
Oct 2019
12.3.1) HANGING BRACKETS ASSEMBLY
A left-hand LH and right-hand RH bracket must be assembled. Torque screws and locknuts to 6.8Nm.
To mount the hanging brackets to the wall/ceiling:
1.
Measure and mark distances for the hanger bracket holes.
2.
Hanging brackets should first be fixed to the wall or ceiling surface by means of 4 lag bolts – not supplied
(M10 x 75mm (3/8” x 3”) minimum) through pre-formed holes in each of the brackets prior to installing
heater. All hanging materials must have a minimum working load of 52kg.
12.3.2) HEATER ATTACHMENT TO HANGING BRACKETS
The heater can be attached to the hanging brackets in angles of 15
0
, 30
0
, 45
0
and 60
0
. Choose the desired heater
mounting angle and find the corresponding hole pattern as per the wall and ceiling mount figures below.
Attach the heater to the brackets using (2) cap screws, flat washers and locknuts provided in the kit. Torque screws
and locknuts to 6.8Nm.
Minimum clearances to combustible must be observed. See Section 4).