6
ID# M88724C1
08/06
1" (2.54 cm)
SIDE VIEW
DRAINAGE HILL
PLAYING SURFACE
Fill hole with concrete. Tamp down concrete to release air pockets
and build drainage hill.
3.
Insert rebar (10) through holes in ground tube assembly (2) as shown.
4.
10
10
10
2