Insert the Server Module Into the Chassis
32
SPARC T5-1B Server Module Installation Guide • May 2014
7.
Use both hands to position the server module vertically with the ejector arms on
the right (panel 1).
8.
Push the server module into the empty slot until the module extends about 0.5
inch (1.5 cm) from the chassis front (panel 2).
9.
Pinch the ejector levers to open them (panel 2).
10.
Push the server module into the chassis and close the ejector levers (panels 2
and 3).
11.
Monitor status messages when power is applied to the server module (panel 4).
When the server module is plugged in, standby power is supplied to the SP. After about 10
seconds, the front panel LEDs blink three times, then the green OK LED blinks for a few
minutes. The server module SP generates messages as soon as the server module is connected to
“Front and Rear Panel Components” on page 12
.
12.
Power on the server module.
See
“Powering On the Server Module for the First Time” on page 35
Summary of Contents for E35202-05
Page 1: ...Part No E35202 05 May 2014 SPARC T5 1B Server Module Installation Guide ...
Page 2: ......
Page 8: ...8 SPARC T5 1B Server Module Installation Guide May 2014 ...
Page 14: ...14 SPARC T5 1B Server Module Installation Guide May 2014 ...
Page 18: ...18 SPARC T5 1B Server Module Installation Guide May 2014 ...
Page 28: ...28 SPARC T5 1B Server Module Installation Guide May 2014 ...
Page 34: ...34 SPARC T5 1B Server Module Installation Guide May 2014 ...
Page 58: ...58 SPARC T5 1B Server Module Installation Guide May 2014 ...
Page 62: ...62 SPARC T5 1B Server Module Installation Guide May 2014 ...