unit left-hand side
unit right-hand side
* The door cover has only been removed as an aid to illustration.
- 56 -
3. Initial
commissioning
Heat generating systems may only be erected and installed by specialist
companies. Initial commissioning may only be carried out by an expert
from the installation company. A certificate confirming proper installation
and correct adjustment/operation of all the control and safety components
must be submitted to the owner/operator of the system.
Initial commissioning may not be carried out until all the requisite
components have been connected up, all the requisite safety devices
integrated and made serviceable, the water heat exchanger flushed,
filled, and the system bled. Operation without water, only partially
filled, or with safety devices that are not serviceable, is not permit-
ted.
On the first four occasions the fire is lit, it must be stoked with a
maximum of 2.0 kg/hour of dry, thin wood (maximum circumference
25 cm).
As a result the fireplace insert, the fireclay and the vermiculite are
slowly
tempered, and the moisture from any storage, transport, etc.,
slowly
evaporated off. If this is not done, the area between the glass panes may
be contaminated and the fireclay crack.
Please note: condensate may appear underneath the fireplace insert. This
does not indicate a leak.
Moreover, the operator must be instructed in detail in how to use the
entire system, as well as its operation and maintenance, including all
supplementary components. Furthermore, the operator must be informed
of the measures required to maintain safe operation of the system.
Once
the induction has been carried out this must be documented in the
commissioning log
.
The installation and operating manual must always be retained and stored
in an easily accessible place near the H
2
O fireplace insert. Further
instructions on operating the H
2
O fireplace insert are given in the enclosed
operating manual for Spartherm fireplace inserts.
The H
2
O fireplace insert/heating systems must be filled and bled before
being lit. The heating system pressure must be checked (~ 1.5 bar) at the
same time. Bleeding must be carried out daily after commissioning. As
soon as no further air is present the interval can be extended.
Summary of Contents for Mini Z1 H2O
Page 5: ...9 Mini Z1 H2O Fig 1a 10 Mini Z1 H2O XL Fig 1b...
Page 6: ...11 Mini Z1h H2O XL Fig 1c 12 Varia 1V H2O Fig 1d...
Page 7: ...13 Varia 1Vh H2O Fig 1e 14 Varia 1V H2O XL Fig 1f...
Page 8: ...15 Varia 1Vh H2O XL Fig 1g 16 Varia 1V H2O XXL Fig 1h...
Page 9: ...17 Varia 1Vh H2O XXL Fig 1i 18 Varia 2Lh 2Rh H2O Fig 1j...