E L E C T R I C A L   D A T A   F O R   T H E   U S E   O F   L I C E N S E D   E L E C T R I C I A N

WARNING: Shock Hazard! Under No Circumstances Should This Spa Be Installed By Anyone Other 

Than A Certified Licensed Electrician!

W A R N I N G !   U S E   C O P P E R   C O N D U C T O R S

All wiring 

MUST

be in accordance with the National Electrical Code and All Local Codes.

Genius Series G-1.5 & G-2 240 Volt Hard Wire Installation

Licensed Electrician
Required

Permanently Hard Wired

Wire Sizing Must Meet
Electrical Codes

A Ground Fault Circuit
Interrupter and a
Disconnect Switch Are
Required.

Leisure Bay GENIUS Series
Spas are NOT EQUIPPED With
A 240v Ground Fault Circuit
Interrupter or a Disconnect
Switch.

Outdoor Load Center
Provides Both

Isolated, Dedicated 240
Volt, 50 Amp Circuit Is
Required

Wiring of the Genius G-2 volt
system must be completed by
a Certified Licensed
Electrician.

All 220 Volt operations wiring
must be permanently hard
wired and installed in grounded
conduit and installed in compli-
ance with the National Electrical
Code and all Local Codes.

All installations are different.
Wire sizing must meet the
National Electrical Code and all
Local Code Specifications.

The National Electrical Code requires that
spas connected to 240 volt circuits be
equipped with a Ground Fault Circuit
Interrupter (GFCI) and Disconnect Switch.
See NEC Articles 680-12 and 680-42.

The addition of a outdoor load
center such as a Siemens
W0408ML 1125 or equal must be
added to the Circuit. This type of
load center provides both a
Ground Fault Circuit Interrupter
and Disconnect Switch in a conve-
nient configurations as required
by the NEC.

An isolated, dedicated 240 Volt, 30 or
50 amp circuit is required to provide
the power necessary to properly oper-
ate the 240v Equipment Package.

For 30 Amp Configuration
See Page 9

CAUTION: CONNECT ONLY TO A CIRCUIT PRO-
TECTED BY A CLASS A GROUND FAULT INTER-
RUPTER. /ATTENTION: CONNECTOR UNIQUEMENT
A UN CIRCUIT PROTEGE PAR UN DISJONCTEUR
DIFFERENTIEL DE CLASSE A.

CAUTION: READ THE INSTRUCTION MANUAL.
/ATTENTION: LIRE LA NOTICE TECHNIQUE.

USE COPPER CONDUCTORS ONLY! / EMPLOYER
UNIQUEMENT DES CONDUCTEURES DE CUIVRE.

Summary of Contents for Genius G-1.5

Page 1: ...This Manual Contains IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS Trend Setting Innovations Since 1973 Spa Owner s Manual Smart S 2 Genius G 1 5 G 2 Series...

Page 2: ...ical Wiring Must be Installed By A Licensed Electrician 120Volt Installation 5 NEMA 5 20Amp Receptacle 5 Isolated Dedicated 120Volt 20Amp Circuit 5 Ground Fault Circuit Interrupter Plug 5 6 Cabinet Pa...

Page 3: ...tory system problems or diabetes should consult a physician before using a spa F Persons using medication should consult a physician before using a spa since some medication may induce drowsiness whil...

Page 4: ...disease circulatory problems diabetes or high blood pressure should check with their physician before using spas Additionally people taking medications causing drowsiness such as tran quilizers narcot...

Page 5: ...owing suggestions and recommendations will help you select a safe and compatible site for your spa maximizing your enjoyment The site must provide a solid foundation with a minimum load bear ing capac...

Page 6: ...tects your spa equipment from the effects of residual calcium hardness and total alkalinity problems Turn power off at the spa consoles and deactivate discon nect switches at the GFCI plug or load cen...

Page 7: ...cord connection to a 240 volt hard wire connection must be completed by a Licensed Electrician in accordance with all codes Special consideration should be given to safety when selecting a location fo...

Page 8: ...ing the Reset button returns power to the spa equipment This same button is used to Reset the GFCI during a test cycle See page 1 number 4A WARNING Shock Hazard No User Serviceable Parts Spa Cabinet p...

Page 9: ...y installed 120 Volt system to a hardwired 240 volt system must be completed by a Certified Licensed Electrician All 240 Volt operations wiring must be permanently hard wired and installed in grounded...

Page 10: ...onduit and installed in compli ance with the National Electrical Code and all Local Codes All installations are different Wire sizing must meet the National Electrical Code and all Local Code Specific...

Page 11: ...Than A Certified Licensed Electrician A grounding lug has been provided on the exterior of the pack chassis to allow connection of a ground wire to a local grounding point to be estab lished in compli...

Page 12: ...10...

Page 13: ...11...

Page 14: ...12...

Page 15: ...13...

Page 16: ...14...

Page 17: ...15...

Page 18: ...spa filter cartridge pleats which may not be thoroughly removed by the garden hose To remove such substances soak the filter in a solution of filter cleaner Various brands of such cleaners are readily...

Page 19: ...hrice Monthly TwiceWeekly Twice Monthly TwiceWeekly Weekly Weekly Twice Monthly HeavyUsage Daily Daily Weekly Daily Weekly TwiceWeekly As Required Weekly As Required IMPROPER WATER BALANCE WILL DAMAGE...

Page 20: ...a soft rag or paper towel and wiping the surface in a circular motion Removing Tub Ring Tub ring is best removed with a specialized commercially available cleaner such as Sun Surface Cleaner Ask your...

Reviews: