07.03.2014 TB-b bta badu jet smart_engl.indd
27
2.2 Qualification and training of operating personnel
The personnel responsible for operation, maintenance, inspection and
assembly must be adequately qualified. Scope of responsibility and supervision
of the personnel must be exactly defined by the plant operator. If the staff does
not have the necessary knowledge, they must be trained and instructed, which
may be performed by the machine manufacturer or supplier on behalf of the
plant operator, moreover, the plant operator is to make sure that the contents of
the operation manual are fully understood by the personnel.
2.3 Hazards in the event of non-compliance with the safety instructions
Non-compliance with the safety instructions may produce a risk to the
personnel as well as to the environment and the machine and results in a loss
of any right to claim damages.
For example, non-compliance may involve the following hazards:
-Failure of important functions of the machines/plant
-Failure of specified procedures of maintenance and repair
-Exposure of people to electrical, mechanical and chemical hazards
-Endangering the environment owing to hazardous substances being released.
2.4 Compliance with regulations pertaining to safety at work
When operating the pump, the safety instructions contained in this manual, the relevant national
accident prevention regulations and any other service and safety instructions issued by the plant
operator are to be observed.
2.5 Safety instructions relevant for operation
-If hot or cold machine components involve hazards, they must be guarded against
accidental contact.
-Guards for moving parts (e. g. coupling) must not be removed from the machine while in
operation.
-Any leakage of hazardous (e. g. explosive, toxic, hot) fluids (e. g. from the shaft seal)
must be drained away so as to prevent any risk to persons or the environment. Statutory
regulations are to be complied with.
-Hazards resulting from electricity are to be prevented (see for example, the VDE
Specifications and the bye-laws of the local power supply utilities).
bta badu jet smart_engl.indd 27
10.03.2014 09:30:59
Summary of Contents for BADU Jet Smart KH
Page 9: ...07 03 2014 TB b bta badu jet smart indd 9 bta badu jet smart indd 9 10 03 2014 09 46 50 ...
Page 10: ...10 07 03 2014 TB b bta badu jet smart indd bta badu jet smart indd 10 10 03 2014 09 46 50 ...
Page 11: ...07 03 2014 TB b bta badu jet smart indd 11 bta badu jet smart indd 11 10 03 2014 09 46 50 ...
Page 13: ...07 03 2014 TB b bta badu jet smart indd 13 bta badu jet smart indd 13 10 03 2014 09 46 51 ...