Installation
A bakeout time between 24 hours and 48 hours (first time) is recommended.
After a bakeout the analyzer needs two days to cool down. If channeltrons are oper-
ated at higher temperatures (> 340 K) they can suffer damage. Some channeltrons will
lose gain and exhibit a markedly higher detector plateau. The interior parts of the
PHOIBOS will cool down significantly slower than the housing. It is recommended to
wait for a complete cool down of the detector assembly; approximately 2-3 days. Even
if the analyzer housing just feels warm, any internal parts seated on isolators may still
be too hot for safe operation. It is imperative that all users be informed of this issue
and take the necessary precautions.
The multiplier will degas at first operation after bakeout, so care should be taken not
to use the detector at full multiplier voltage and full intensity within the first few hours
after bakeout. We recommend increasing the detector voltage over a period of 1.5
hours for the first use and over a period of 10 min for subsequent times after bakeout.
(Use the SpecsLab mode Detector Sweep and set start, end, step and dwell time para-
meter for this procedure.)
4.7 Electronic Units Installation
The electronic units have to be installed into a 19”-cabinet rack. Good air circulation
within the cabinet must be ensured. For wiring of the electronics follow figure 2 (page
7).
Note the following:
1. Connect all units to the same power strip.
2. The power strip must be provided with a protecting device according to, and
meeting all safety regulations.
3. A grounding bar (copper, brass) with a minimum cross section of 6×6 mm
2
has
to be installed inside the cabinet. The electronic unit has to be connected to this
grounding bar.
4. The grounding bar inside the cabinet has to be connected to the system (e.g. to
the analyzer housing) by a ground cable of a minimum cross section of 10 mm
2
.
The connections between analyzer, control unit and computer are described in section
2.2, “Electrical Connections” on page 6. All connections described above have to be
made before the initial operation of the system.
4.8 SpecsLab Hardware and Software Installation
Read the instructions (e.g. section 2.2 , "Electrical Connections" on page 6 and Spec-
sLab2: Chapter 1: Installation) carefully before installing SpecsLab2 and evaluation pro-
gram. You will find the manuals and other instructions in pdf-format on the installation
CD as well.
Please do not hesitate to contact SPECS for more detailed information.
support@specs.de or
phone +49 (30) 467 824 - 0 or - 88)
44
Summary of Contents for PHOIBOS 100
Page 1: ...PHOIBOS Hemispherical Energy Analyzer Series PHOIBOS 100 PHOIBOS 150 3 1...
Page 6: ...Table of Contents PHOIBOS...
Page 10: ...Introduction 4 PHOIBOS...
Page 13: ...Electrical Connections Figure 2 Connection Scheme PHOIBOS 7...
Page 14: ...Components and Connections Figure 3 Analyzer Housing PHOIBOS100 8 PHOIBOS...
Page 15: ...Electrical Connections Figure 4 Analyzer Housing PHOIBOS150 PHOIBOS 9...
Page 42: ......
Page 51: ...SpecsLab Hardware and Software Installation PHOIBOS 45...
Page 52: ......
Page 62: ......
Page 78: ...Analyzer Checks Figure 33 Schematics of the 12 pin Analyzer Feedthrough 72 PHOIBOS...
Page 80: ......
Page 86: ......
Page 92: ...List of Figures Figure 39 Alignment Pin 84 II PHOIBOS...
Page 93: ...List of Figures PHOIBOS III...
Page 94: ......
Page 96: ......
Page 98: ...Index PHOIBOS...