Manual Operation continued….
4. Turn the Main Breaker on.
Main Breaker
Boost pump Run Switches
5. Confirm the boost pumps are full of water.
The feed tank level should allow the pump
baskets to fill by just “cracking” the seal on
the lid. Be prepared to reseal the lid by placing
a knee in the middle of the lid to push it down
while tightening the lid.
Note; if the pump bowls do not fill per the
above, remove the lid and fill the bowl com-
pletely with water. This should allow the
pump(s) to prime.
6. Start the boost pump;
Flip toggle switch up into the Run position
Push the momentary switch to the right up to ‘Manual Start’
to start the pump.
7. Confirm there is pressure at the media filters.
adjust the pressure with the knob on the
speed control to 25psi at the media filter
gauge.
Summary of Contents for LB-20000
Page 2: ...2 Page Intentionally blank...
Page 4: ...4 Page Intentionally blank...
Page 48: ...48 Black Parker tube fittings...
Page 49: ...49 John Guest Super Speedfit Fittings...
Page 64: ...64...
Page 65: ...65...