7
Unpack the system and inspect it to make sure that it has not been damaged in shipment.
Refer to the shipping list for your system to make sure you have received all of the compo-
nents listed. Do not discard any packaging until you have found and identified all of the
parts. The small installation parts are listed on the cellophane bags’ pick list.
We will not be held responsible for shortages and or freight damage that are not reported
within thirty days of the ship date.
Next, study the system layout diagram, component photos and descriptions before beginning
your installation. This will assist you in understanding the function of each component.
Layout the system. Before starting the installation identify the location where each module
and component will be placed. Insure that there is proper clearance around the components
for removal of filters and system service. Also check to make sure you have adequate tubing
and hose before starting so additional parts may be ordered. Check to see that the MPC cable
is long enough to reach from the display location to the feed pump module.
Newport MkII shipping list:
•
Newport Feed Pump Module
•
High Pressure Clark Pump and Reverse Osmosis Membrane Module
•
MkII Fresh Water Flush Module
•
MkII Installation Kit 400
•
Boost Pump Module
•
Newport Service Kit
•
1/2” braided hose (10’)
•
1/2” Black Nylon tube (10’)
•
5/8” Hose (25’)
•
3/4” Suction Hose (25’)
•
3/4” Braided Hose (10’)
Getting Started