Membrane Output Calculation Example

What is the expected GPD from a 75 GPD System at 40 psi pressure and 60°F 
water temperature?
 

PCF = 40 ÷ 60 = 0.666

 

TCF = 0.754 (from Table 1)

 

Expected GPD = 75 × 0.666 × 0.754 = 37.7 GPD ± 15%

 

37.7 GPD would be the Actual Production Rate

Performance Test

The performance of a RO membrane is measured by its ability to reject salts 
(or TDS (Total Dissolved Solids)). 

Important: Test the quality of the membrane once every 6 months.

Note: This procedure will require a Conductivity Meter (TS-C61) or TDS Meter (TS-T71).

Procedure:

 

1.  Measure tap water conductivity. (Call it X)

 

2.  Run the system for 15-20 minutes.

 

3.  Rinse test instrument cell 2-3 times with RO water.

 

4.  Measure RO water conductivity directly from the blue product 

 

 

water line. (Call it Y).

 

5.  Subtract RO water conductivity from tap water conductivity. (X - Y) 

 

6.  Divide this quantity by tap water conductivity. (X - Y) ÷ X 

 

7.  Rejection = [(X - Y) ÷ X ] ×100 

* Conductivity in the above procedure could be replaced by hardness, alkalinity, 
nitrate, phosphate, silica etc. (measured in ppm or mg/l).

Rejection of the RO Membrane Calculation Example

 

1.  Tap water hardness = 150 ppm (X)

 

2.  RO water hardness = 7 ppm (Y)

 

3.  X - Y = 143 ppm

 

4.  (X - Y) ÷ X = 143 ÷ 150 = 0.953

 

5.  Rejection = [ ( X - Y)  ÷ X ] ×100 = 0.953 ×100 = 95.3

 

Membrane Hardness Rejection = 95.3 % :  Rejection rates less than 95% may

 

 indicate that the membrane should be replaced.

SpectraPure®Inc

 Fax  480.894.6109 Fax us toll-free 1.877.527.7873

E-mail: spectra@spectrapure.com Visit us on the web www.spectrapure.com

3

SpectraPure

®

TERMS AND CONDITIONS OF SALE

1.     Shipping charges on units or parts submitted to our facility for repair or 

replacement must be borne by the registered purchaser. After repair or 
replacement, the factory will return the unit or part freight prepaid to the 
customer. 

2.     We assume no warranty liability in connection with our equipment other than as 

herein specified.

3.     This warranty is in lieu of all other warranties expressed or implied, including 

warranties of fitness for a particular purpose. 

4.     We do not authorize any person or representative to assume for us any other 

oblligation on the sale of our equipment. This is the exclusive remedy and liability 
for consequential damages under any and all warranties which are excluded to 
the extent exclusion is permitted by law. 

5.     Proof of original purchase date must accompany all warranty claims. 

6.     SpectraPure, Inc. reserves the right to change prices without notice when  

necessary. All prices in the catalog are quoted in US dollars. 

7.    Claims for error in quantity or condition must be made within 10 days of receipt 

of material. SpectraPure, Inc. will not be responsible for any claimed shortages 
not reported within 10 days. Returns other than warranty claims may be subject 
to 20% restocking fee.

8.     SpectraPure, Inc. cannot be held liable for damage or loss to a shipment by a 

freight carrier. Check shipment for damage before acceptance or note on freight 
bill subject to inspection for concealed damage. Consignee must file claim. 
SpectraPure, Inc. will offer as much assistance as possible.

9.     A complete credit check is required prior to shipping on a Net 30 or “C.O.D. - 

CUSTOMER CHECK ACCEPTABLE” basis. In the interim period during which credit 
references are being evaluated, all orders must be shipped “C.O.D. - CERTIFIED 
FUNDS” (cash, cashiers check or money order).

10.   All returned checks (due to insufficients funds or closed accounts) will be 

subjected to a 

$25 service charge.

 

Invoices on Net 30 accounts not paid within 30 days of shipment will be considered delinquent and 

will accure Finance charges at the rate of 1.5% per month (18% per annum).

Summary of Contents for THE MAXCAP RO/DI System

Page 1: ...ilter Wrench Optional Accessories Model Optional Part FAU SMP Quick Connect Faucet Coupler TK CL 10 Total Chlorine Test Kit VA FVK 4 Flush Valve Kit BPLF MO 115 Low Flow Booster Pump 115V BPLF MO 230...

Page 2: ...for any consequential damages arising from installation or use of the product including any water or mold damage due to flooding which may occur due to malfunction or faulty installation including bu...

Page 3: ...ered purchaser After repair or replacement the factory will return the unit or part freight prepaid to the customer 2 We assume no warranty liability in connection with our equipment other than as her...

Page 4: ...sure greater than 80 psi will require a pressure reducing valve SpectraPure Inc Fax 480 894 6109 Fax us toll free 1 877 527 7873 E mail spectra spectrapure com Visit us on the web www spectrapure com...

Page 5: ...water is passed through a 0 5 micron Micro Tec sediment pre filter This filter is required to remove excess turbidity particulate matter that may cause the carbon block filter to plug 2 The second st...

Page 6: ...ure When the prefilters are new the pressure shown on the gauge will be slightly less than the actual tap water pressure and as the filters age the pressure will drop due to the dirt that will collect...

Page 7: ...vi Acidify feed water to the RO membrane to improve its rejection h Faulty monitor probe Test and Replace if required SpectraPure Inc Fax 480 894 6109 Fax us toll free 1 877 527 7873 E mail spectra s...

Page 8: ...at is located inside of the tubing Do not remove or discard this restrictor the system will not produce permeate water without the flow restrictor All of the following conditions must be met before wa...

Page 9: ...assure you of maximum life and reliability of your SpectraPure System Failure to perform this procedure can permanently damage the membrane and will void the pro rated Membrane Warranty In order to m...

Page 10: ...RO membrane may be calculated and the resultant number may then be used to determine the condition of the membrane and thus the operator will know when the membrane needs to be replaced Membrane failu...

Page 11: ...te the yellow concentrate tubing Fig C Remove the tubing from its push fitting at the membrane as follows a Firmly depress and hold the push fitting collar down with your thumbnail b While the push fi...

Page 12: ...fe the sediment pre filter must be changed when a 15 20 drop in pressure is observed OR at least 6 month intervals If your water contains a great deal of sediment the pre filter may require more frequ...

Reviews: