Synchronization and Deployment Guide
Chapter 4: On-site Deployment
Below you will find at list of tools to bring on a site, and descriptions of how to deploy Spectralink
IP-DECT 400/6500 Server and Spectralink DECT 2500/8000 Server.
Deployment Tools
Bring the following tools for deployment:
•
•
•
•
1 Spectralink IP-DECT server 400
1 Battery pack min. 8V/max. 60V
1 Tripod (app 2m high)
1 Cable with RJ45 plug (pin 1 must be connected to pin 3, pin 2 must be connected to pin 6)
Preferably the tripod shall place the Spectralink IP-DECT server 400 at the height where you will
place the server/base stations/repeaters in the final installation.
If 2 people perform the deployment at IP DECT sites you shall also bring:
•
Minimum 1 Spectralink DECT repeater (the repeater must be set up to synchronize on the
Spectralink IP-DECT server 400 used for the deployment).
9V Battery pack
1 Tripod (app 2m high)
•
•
•
1 Cable to connect battery pack and DECT repeater (with RJ11 plug in for the repeater) For a
description of pin connections, see the information on the Power Adaptor.
14169000 Version 9.3
October, 2016
11