Synchronization and Deployment Guide
IP Base Station using Synchronization Over The Air
It is recommended to deploy a system as a star system with the sync master placed in the middle.
Sync master
Sync chains
Deployment procedure
Start by placing your tripod with the Spectralink IP-DECT server 400 (from your deployment tools)
where you plan the first base station (the sync master) to be:
14169000 Version 9.3
October, 2016
14
Necessary overlap in sync chains
Necessary overlap between sync chains