SL SERIES MANUAL
5
118006-001 REV T
Chapter 2
I
NSPECTION
&
I
NSTALLATION
nitial inspection and preliminary checkout procedures
are recommended. For safe operation, please follow
the step-by-step procedures described in Chapter 3,
Operating Systems.
2.1 Initial Inspection
Inspect the package exterior for evidence of damage due
to handling in transit. Notify the carrier and Spellman
immediately if damage is evident. Do not destroy or
remove any of the packing material used in a damaged
shipment.
After unpacking, inspect the panel and chassis for visible
damage.
Fill out and mail the Warranty Registration card
accompanying the unit. Standard Spellman SL Series
high voltage power supplies and components are covered
by warranty. Custom and special order models (with an
X suffix and the model number) are also covered by
warranty.
2.2 Mechanical Installation
I
Units in the SL Series have front panel holes for standard
EIA rack mounting. The rack must allow rear access for
cable connections. Units are fully enclosed and are
suitable for bench or table top operation. Standard unit
dimensions are shown in Figure 2.1. It is strongly
recommended to support the chassis by guides or slides.
Slides are available for ease of servicing (SL option).