IM-P408-04
EMM Issue 7
17
B850-W and B850-P Boiler House Energy Monitor
4.
Slide the top mounting lug over the proud screw.
5.
Line up, and fit the screws to the bottom mounting holes.
6.
Refit the terminals enclosure cover.
Note: Before actioning any installation observe the 'Safety information' in
Section 2.
Top mounting lug (external)
Fig. 16
3.
Fix an M5 (No. 10) screw to the surface for the top mounting. Leave the head
of the screw proud of the surface, just enough to allow the top mounting lug of
the B850 to slide over.
Mounting screw left proud of surface to slot top mounting of
B850 over.