IM-P408-04
EMM Issue 7
50
B850-W and B850-P Boiler House Energy Monitor
10.31.2 TDS calculation
Click on process values 'Y' then Pt the BBD valve input
calculation
will then be displayed, input values required.
Click on the process values
Thresholds (
T
), totalisers (
t
), alarms (
A
) and graph settings (
G
) can be set up for
the Bottom Blowdown Calculation, for full details see B850 Boiler House Energy
Monitor Installation and Maintenance Instructions IM-P408-03.
The Quickstart Configuration is pre-configured with suitable settings.
G
T
A
t