background image

IM-P402-62  AB Issue 5

7

1

2

3

4

5

6

7

8

9

10

11

12

+

+

11

12

10

11

12

10

11

12

+

10

11

12

10

11

12

ON

1
2

ON

1

2

ON

1
2

ON

1
2

A

1

2

3

1

2

3

Select
voltage
internally

4 - 20 mA Test - connect ammeter between
terminals 5 and 6. Do not dissconnect loop.

0 - 20 mA
or
4 - 20 mA

LP20 /PA20

Capacitance

probe

Alternative
remotely
powered
current
or voltage
input

INPUT

L

N

Mains

Fuse

Max. 3A

Common

Common

Additional

unit if fitted

4 - 20 mA transmitter

powered from the

LT2010

Additional

unit

Multiple transmitters

Several transmitters can be
connected to a single probe if
required.
Connect wiring as shown in the
diagram.
Ensure resistance from probe
body to pipework /boiler shell is
less than 1 

W

.

Links on preamplifier provide sensitivity
selection - see preamplifier IMI
The earth pin is internally connected to the
PA20 body and earthed by the LP20 probe.
Do not connect this earth pin to other earths.

Fig. 5

Test

Output - Maximum 1000 

W

LP20 /PA20

Capacitance

probe

Screen

Screen

Ensure resistance from probe body to
pipework /boiler shell is less than 1 

W

.

See CAUTION page 6

Summary of Contents for LT2010

Page 1: ... Maintenance Instructions IM P402 62 AB Issue 5 4025351 5 1 General safety information 2 General product information 3 Installation 4 Settingupthetransmitter 5 Wiring diagrams 6 Commissioning 7 Maintenance 8 Fault finding LT2010 100 0 Printed in the UK Copyright 2003 ...

Page 2: ...e injury or fatality to personnel Warning Isolate the mains supply before unplugging the transmitter since hazardous voltages will be exposed on the transmitter base This product complies with the requirements of Electromagnetic Compatibility Directive 89 336 EEC by meeting the standards of BS EN 50081 1 Emissions and BS EN 61000 6 2 Immunity The following conditions should be avoided as they may ...

Page 3: ...e very different turbulence conditions found in tanks and high output boilers The LT2010 is set up before installation to suit the mains supply voltage and to provide the required functions using internal switches See Setting up the transmitter Section 4 Calibration can be altered without removing or dismantling the unit using the zero point and full scale span potentiometers on the front panel Ma...

Page 4: ...screwed directly to a chassis plate Caution Allow 15 mm spacing between multiple units for air circulation The transmitter is for installation Category II Overvoltage category and must be installed in accordance with IEC 60364 or equivalent The transmitter and all connected circuits must have a common isolation system which meets the relevant requirements of IEC 60947 1 and IEC 60947 3 or equivale...

Page 5: ...e with a temperature transmitter for example set switch 1 and 2 to ON 4 5 Inverse output Switch 3 The transmitter is supplied set so that a rising level at the probe will give a rising output from the transmitter If a falling transmitter output is required with a rising input as when using a differential pressure transmitter for level monitoring set Switch 3 to OFF 4 6 Wave filter Switch 8 This fe...

Page 6: ... from electric shock under a single fault condition This product has double insulation and therefore does not require a protective earth A functional earth is used in order for the product to operate In this application the earth tank boiler shell is used as the common of the probe preamplifier It also provides a sink drain for any electrical interference Ensure that the screen is connected to the...

Page 7: ...itter powered from the LT2010 Additional unit Multiple transmitters Several transmitters can be connected to a single probe if required Connect wiring as shown in the diagram Ensure resistance from probe body to pipework boiler shell is less than 1 W Links on preamplifier provide sensitivity selection see preamplifier IMI The earth pin is internally connected to the PA20 body and earthed by the LP...

Page 8: ...ing and inspection General guidance is given in Health and Safety Executive Guidance Note PM5 For specific instructions for the Spirax Sarco system please see separate literature Available spares Spare fuses Stock No 4033380 Set of 3 Most faults which occur on commissioning are due to incorrect wiring or setting up In the case of problems the following checklist may be helpful Mains on LED not lit...

Reviews: