background image

SSC20

Sanitary Sample Cooler

IM-P403-83-US 

May 2006

INSTALLATION AND MAINTENANCE INSTRUCTIONS

1. Safety information

2. General product information

3. Installation

4. Commissioning

5. Operation

6. Maintenance 

7. Spare parts

1. Safety information

1

Safe operation of these products can only be guaranteed if they
are properly installed, commissioned, used and maintained by
qualified personnel (see Section 1.11) in compliance with he oper-
ating instructions. General installation and safety instructions for
pipeline and plant construction, as well as the proper use of tools
and safety equipment must also be compiled with.

1.1

Intended use

Referring to the Installation and Maintenance Instructions, name-plate
and Technical Information Sheet, check that the product is suitable for
the intended use/application. The products comply with the require-
ments of the European Pressure Equipment Directive 97/23/EC and fall
within category ‘SEP’. It should be noted that products within this cate-
gory are required by the directive not to carry the  mark. 

i)

The products have been specifically designed for use on steam 
and water, which are in Group 2 of the above mentioned Pressure
Equipment Directive. The products’ use on other fluids may be 
possible but, if this is contemplated, Spirax Sarco should be 
contacted to confirm the suitability of the product for the
application being considered.

ii)

Check material suitability, pressure and temperature and their 
maximum and minimum values. If the maximum operating limits of
the product are lower than those of the system in which it is being 
fitted, or if malfunction of the product could result in a dangerous 
overpressure or overtemperature occurrence, ensure a safety 
device is included in the system to prevent such over-limit 
situations.

iii)

Determine the correct installation situation and direction of 
fluid flow. 

iv)

Spirax Sarco products are not intended to withstand external 
stresses that may be induced by any system to which they are 
fitted. It is the responsibility of the installer to consider these 
stresses and take adequate precautions to minimize them.

v)

Remove protection covers from all connections before installation.

1.2

Access

Ensure safe access and if necessary a safe working platform (suitably
guarded) before attempting to work on the product. Arrange suitable
lifting gear if required.