XE100 / XE200 / XE300 Elliptical
10
*STEP 2: XE100 ONLY
: HANDLE BAR ASSEMBLY
1. Install the two 17m/m Wave Washers (83) onto the Left and Right side of the Handle Bar axle.
2. Slide the Left (10) and Right (11) Handle Bars onto the appropriate side of the axle. The
handlebars have a small sticker on them indicating
L
(left) and
R
(right).
3. Put the two 5/16" x 23mm Flat Washers onto the two 5/16" x 15m/m Hex Head Bolts and install,
and tighten, in the threaded holes in the ends of the axle.
*STEP 2:
XE200 ONLY
: HANDLE BAR ASSEMBLY
1. Install the two 28m/m Wave Washers (81) onto the Left and Right side of the Handle Bar axle.
2. Slide the Left (10) and Right (11) Handle Bars onto the appropriate side of the axle. The
handlebars have a small sticker on them indicating
L
(left) and
R
(right).
3. Put the two 3/8 X 30mm Flat Washers (97) onto the two 3/8” X 3/4” Hex Head Bolts (103) and
install, and tighten, in the threaded holes in the ends of the axle.
4. Connect the two wires together (124, 125) and store the excess, including plastic connectors,
back into the console mast. Place the rubber grommet (123) over the wire and snap it into the
hole in the console mast.
STEP 3: CONNECTING ARM ASSEMBLY
1. Align the hole in the rod end of the left Connecting arm (8) with the hole in the bracket of the
left Handle Bar (10). The rod end should be on the inner side of the Handle Bar bracket. Make
sure the ty-wrap is removed from the rod end and the sleeve spacer (22) does not fall out
during assembly. Take one 5/16" x 1-1/4" Hex Head Bolt (104) and install it through the Handle
Bar bracket and the rod end. Install one 5/16" x 20 x 1.5T Flat Washer (80) and one 5/16" x
7mm Nylon Nut (71) on the 5/16" x 1-1/4" Hex Head Bolt (104) and tighten as tight as possible
using the two12m/m Wrenches provided. Repeat the procedure for the right side Pedal
/Connecting Arm.
*STEP 4: XE100 ONLY:
PLASTICS ASSEMBLY
1. Install the Connecting Arm Covers (2 each 57, 58) over the connection of the rod end and
Handle Bars with four M5 x 15m/m Screws and two 3.5x10m/m Self Tapping Screws by using
the Short Phillips Screw Driver.
2. Install the two Wheel Covers (52) using the four M5x15m/m Phillips Head Screws (105).
3. Locate the two Rear Stabilizer Covers (19,20) and two Middle Stabilizer Covers (19,20) for the
Rear Rail Assembly and install with four M5 x 15m/m Screws (105). Then install front stabilizer
cover (49) with two M5 x 15m/m Screws (105).
4. Install the Front Handle Bar Covers (54-1 left, 55-1 right) and Rear Handle Bar Cover (54 left,
55 right) over the Handle Bar axle connections with the six 3.5x10m/m Self Tapping Screws.
5. Install the front (122) and rear (121) console mast covers with three M5 x 15m/m Screws (105)
and two 3.5x12m/m Self Tapping Screws (87).
*STEP 4: XE200 ONLY:
PLASTICS ASSEMBLY