Model
XE526SE
Work
Replacing Parts
The Part 5. The Cross Bar
Rev.
Procedures
:
5.
To resume, first install the drive pulley
onto the cross bar and return it on the
crank axle, insert 7x7x25L Woodruff
Key and tighten M8x40 Socket Head
Cap Bolt with M8x6.3T nuts until 500
kg-f of torque then tighten 5/16" x 15m/m
hex head screw with 5/16" x 35 x 1.5T
flat washer, as shown in figures 5 & 6.
6.
Follow procedures 4, 3 and 2 to return
the connecting arm, pedal arm and side
covers with round disk cover.
5
6