Data di emissione:
November, 2016
Revisione:
2
Pag. :
23/40
-Place the container (A) on a flat surface (fig.
11). Grasp the central shaft with one hand and
pull lever F (fig 7) outwards with the other in
order to disassemble the bowl into the stainless
steel base and the transparent cylinder.
- To remove the drip tray (P) lift up it and pull it
in the direction of the arrows as shown in fig.
13.
- Thoroughly wash all the removed components
with hot water and dish washing, but do not use
abrasive detergents or powders that can
damage the bowl.
IMPORTANT
Do not use too aggressive sanitizers or
detergents, these kind of products could
damage the bowl and the other
components.
CAUTION
Never perform these washing operation
with a dish washing machine; failure to do
so could seriously damage the unit’s parts.
- Rinse well and then place all the components
in the sanitizer solution; for proper sanitizing
the parts must remain fully plunged as
recommended by the sanitizer manufacturer.
- After respecting the correct sanitizing period,
rinse well all the components with clean water
and dry them up with a clean cloth.
- Once performed all these cleaning and
sanitizing procedures, it’s possible to
reassemble all the components.
- When fitting, position the seal (G) as shown in
fig 12.
- In order to facilitate fitting operations, spread
Vaseline or another suitable lubricant over the
seat of the container (A) where it comes into
contact with the seal (G) (fig. 12).
- Pull the lever (F) outwards, pushing the tank
downwards so that it fits into its seat (fig 12).
- Re-insert the tap spreading Vaseline on the O-
rings to facilitate sliding the tap in its seat until
completely inserted.
- Re-assemble the mixer back on the shaft and
check for their correct coupling.
- Check for the G gasket position in order to
avoid any possible interference with the mixer
rotation.
!Warning!
If the tap does not perfectly slide into position,
the sealing hold will be endangered.
- Reassemble the drip tray.
Fig. 11
Fig. 12
Fig. 13