LEFT SIDE CONNECTING TUBE AND JOINT COVER ASSEMBLY
Step 1. Equip the left side connecting tube (C1) onto the main frame (A).
Secure it by using the screw (J8) on the top and the two
screws (J2) with the iron bracket (F2) on the
bottom as the right side tube (C2) in FIGURE 2.
Step 2. Now you can tighten all the screws (J8, J2)
in FIGURE 2 to FIGURE 3.
Step 3. Disassemble 2 pieces of screws (F6) from the
central supporting tube (F1).
Step 4. Connect the joint covers (F3 & F4) onto
the central supporting tube (F1) and
secure by screws (F6).
PEDAL SUPPORTING TUBE ASSEMBLY
VIEW D
A
J9
J4
J3
B2
J4
J5
B5
J9
VIEW E
USE TOOL:6m/m
#19
A
C1
J8
F6
F6
F3
F4
J2
USE TOOL:4m/m
6m/m
F1
VIEW C
Step 1. Referring to the VIEW D shown, tighten nut
(J4), washer (J9) and screw (J3) after
locking screw (J5), washer (J9) and nut (J4)
in VIEW C.
Step 2. Connect the right pedal supporting tube (B2) with the
main frame (A) and fix them using nut (J4),washer (J9),
and screw (J3) as shown in VIEW D.
Step 3. After assembling in VIEW D, secure the tube by
tighten the preinstalled bolt (J5) and nut (J4)
referring to VIEW E.
Step 4. The left side tube assembly (B1) is the same as
the right side.
4