381-404H WHEELCHAIR SWING
Installation Guide
5
Before you begin
Review your swing footing and top view drawings to ensure your site is
large enough.
Read through the entire instruction booklet before beginning the actual
installation.
Before you begin preparing the site or digging any holes you must first
contact you local utility companies so they can visit the site and mark all
of the buried utilities. In the U.S. you may call 811 and your call will be
routed to your local utility center.
This equipment was designed to install on a clear and level site. There
should be no more than 3” of grade variations in a 10’ span.
Footing layout is the first critical step once the installation begins. Mark
all holes using the footing diagram. Prior to digging holes compare the
measurements from the footing diagram to the actual site markings to
ensure accuracy. Then check it again!
Our posts are manufactured to accommodate 12” of protective surfacing.
Evaluate the site for drainage. To ensure good drainage around the
equipment consult a local professional.
Do not leave the jobsite un-attended during installation unless all access
points to the play area are secure, all bolts and fasteners are tight and all
ground holes are covered.