March 2, 2016
8
381-403H WHEELCHAIR SWING
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__10)
Once the concrete has set
, back fill dirt over the footing
holes; inspect the area and components for tools, hazardous debris
and sharp edges. Verify all components are installed and all
hardware is tight and then install the safety surfacing.
__11)
Inspect the components:
for sharp edges and if necessary
file them down and apply touch up paint.