50
1.
1.
Connect all wires very carefully, and make sure that all wires are correctly connected.
Remove the screw in the base frame first.
Step 3:
Install the meter
Step 4:
Remove the screw in base frame
2.
2.
Use 4 Screw M4*15 to fasten the meter to the steel board (Tighten these 4 screws)
Turn power on and start the machine. If all functions work well, tighten all screws
1.
Use 4 Screw M4.2*15 to fasten left and right decorative covers.
Step 5:
Install decorative covers
Screw M4.2*15
Summary of Contents for F48
Page 1: ...FITNESS TECHNOLOGY MADE IN GERMANY F48 DE EN ES FR IT ...
Page 9: ...9 4 ÜBERSICHT Übersicht über alle Einzelteile des Laufbands ...
Page 37: ...37 ...
Page 39: ...39 ...
Page 74: ...74 ...
Page 76: ...76 ...
Page 77: ...77 ...
Page 113: ...113 ...
Page 115: ...115 ...
Page 151: ...151 ...
Page 153: ...153 ...
Page 190: ...190 ...
Page 192: ...192 ...
Page 193: ...193 ...
Page 194: ...194 ...
Page 195: ...195 ...