background image

 

19 

 

 

15.  Warranty 
 

 

Spreco Lda.

 

guarantee that all appliances sold by the company do not show any 

material or processing defects within the period of warranty. 
 
Period of warranty for Silentwind generator: 

 

 

 

36 months 

Charge regulator W + S 1   

 

 

 

 

 

24 months 

 
If material or processing defects are detected in this period, Spreco Lda. will repair 
the appliance or replace broken parts of the appliance at their expense. 
 
Guaranty is only provided if the warranty note (page 21) is filled in properly and the 
original invoice can be presented. 
 
Guaranty does not cover: 
 

  Regular checkups, maintenance, repair or replacement of worn out parts. 

  Charges for transport, freight and the risk of transport which are directly 

related to the case of warranty. 

  Damages that have been caused by wrong use or mistreatment of the 

appliance, especially if the damage is due to mounting the system to an 
inappropriate / unsuitable mast (construction). In case of damage the 
customer will have to prove that the windgenerator has been mounted to an 
appropriate mast (construction). 

  Damages caused by acts of nature beyond control Spreco Lda. cannot be held 

responsible for, especially lightning, flooding, snow (ice) load, fire etc. 

 

If the appliance must be demounted for a warranty case and mounted again after 
repair or replacement, the expenses for these procedures are not covered by Spreco 
Lda. Whether repair or replacement is appropriate or necessary is up to Spreco Lda. 
decision only. If neither repair nor replacement are possible, the customer is only 
entitled to withdraw the order. 
 

Soweit zwingendes Recht nichts anderes vorsieht, beschränken sich die Ansprüche 
des Käufers gegen die Firma 

Spreco Lda. 

auf diese Gewährleistungsbestimmungen 

und weder 

Spreco Lda., 

noch die Vertreiber der Produkte übernehmen darüber 

hinaus eine Haftung für unmittelbare oder mittelbare Schäden aus irgendeiner 
ausdrücklichen oder einer möglicherweise Schlussfolgerungen zulassenden 
„praktizierten“ Garantie für dieses Gerät

 
Otherwise the general terms of delivery for products and services of the electricity 
industry in Portugal are applied. 

Summary of Contents for Silentwind

Page 1: ...instructions for use installation manual SILENTWIND...

Page 2: ...ailability of electric energy without the possibility of grid connection is essential Fair winds at any time The Spreco Team Please note that this manual is part of the product and must be read closel...

Page 3: ...nical data 7 3 3 Dimensions 7 3 4 Power diagram 8 4 List of enclosed parts 8 5 Operation description 9 6 Diameters of cables 9 7 Installation 9 8 Getting started 11 9 Run and stop 12 10 Charging indic...

Page 4: ...d carbon fiber blades were successfully tested in a wind tunnel up to wind speeds of 35m s 63 knots according to DIN EN 61400 2 Therefor you need not worry about the Silentwind generator in any storm...

Page 5: ...Never ever touch the open end of the wires The currents on charging the batteries can reach more than 30 A DC The whole wiring electric components and connection points must be able to carry a current...

Page 6: ...C Rated power 400 Watt Rated peak power at 13 5 m s Start up speed 2 2 m s Start of charging 3 m s Charge indicator Blue LED on the buttom of housing 3 1 2 Mechanical date Safety test in wind tunnel 1...

Page 7: ...ge 12 24 VDC Max input current windgenerator 30 A Max input current solar 10 A 100Wp LCD LED displays W V A kWh Ah load data 3 2 2 Mechanical data weight 1 15kg regulator Package dimensions 190x120x65...

Page 8: ...parts All information is reliable The producer does not take any resonsibility for inaccuracies The user of both the instructions and the product takes any responsibility and any risk All specificatio...

Page 9: ...equivalent of sonic velocity at the tips of the blades For every day use and safety reasons we have equipped the charge regulator with an additional electronic and manual stop switch 6 Diameters of c...

Page 10: ...ice Once the mast is mounted you can start the relatively simple installation of the Silentwind generator First connect the 3 CF blades to the assembly hub see page 17 sketch 4 with the enclosed srews...

Page 11: ...ntrolle Mast construction Optional check according to instruction especially all srew connections bracing vertical position Grounding and lightning protection according to local regulations Electric i...

Page 12: ...ator A blue LED at the bottom of the body shows you when the charging process starts This depends on the state of charge of the battery normally 12 5 volt Attention If you operate the system with a 3...

Page 13: ...bearings as to free movement bearing play and watertightness Deficient bearings must be replaced 11 4 Corrosion protection The complete housing is made of seaworthy alumine and additionally powder co...

Page 14: ...th instruction Generator shaft sluggish Turn manually Connection windgenerator charge regulator short circuit of AC cables short circuit of generator customer service Windgenerator doesn t charge Poss...

Page 15: ...iences Charge regulator wrongly installed Check in line with manual Correct installation Charge regulator stop switch is in position stop Switch stop switch in position RUN Observe manual instructions...

Page 16: ...16 14 Attachment sketches sketch 1 sketch 2 sketch 3...

Page 17: ...17 sketch 4 sketch 5 sketch 6 sketch 7...

Page 18: ...18 sketch 8 sketch 9 sketch 10 sketch 11...

Page 19: ...ill have to prove that the windgenerator has been mounted to an appropriate mast construction Damages caused by acts of nature beyond control Spreco Lda cannot be held responsible for especially light...

Page 20: ...20 Notice...

Page 21: ...rialnumber windgenerator Seriennummer Laderegler Serialnumber charge controller Verk ufer Firmenstempel Unterschrift Purchaser company stamp signature Kaufdatum date of purchase Die genauen Garantie B...

Reviews: