Roof Vent Assembly x 4PCS
REPEAT the same assembly for another side.
S05/M06
S05/M06
Use the nut M06 to secure the long screw S05 through the holes of
*The wingnut M05 must be secured once the vent arm W06 is locked
S05
M06
M05
W08/W08A
each W08 & W08A.
in place in windy days.
* The roof vents should be lifted through
the vent opening from the inside of the
greenhouse, then lowered into position
from above the greenhouse. So the
holes of the L15A line up with the
ridge holes. Then the vents can
be bolted in place firmly using
the S02 and the nuts.
Note: If you have a greenhouse with an extension kit, the W08/W08A
will have pre-riveted pins. It is ideal to use the wingnut fittings
on the windy elevation of the greenhouse.