8

Plan

6" MIN.

 

5"

6" MIN.

 

5"

ANCHOR BOLTS

(SEE NOTE 5)

6" MIN. 

6" MIN.

 

A

 

SP

ACES A

T 4'-0" = 

PER CELL

CASED ENDWALL FACE

CASED ENDWALL FACE

AIR INLET F

ACE

AIR INLET F

ACE

SUMP

W

  IN TO IN OF BASIN

NOTE

1  

Use this bulletin for preliminary layouts only.

 Do not 

use for construction. Obtain current drawings from your 

Marley sales representative. Concrete basin design and 

construction are by other contractors or purchaser.

2  Operating weight is total wet operating weight of tower 

only, excluding water in concrete basin.

3  Maintain at least 2'-0" of clear space at tower endwalls 

for construction purposes. Air inlet faces must have 

unobstructed air supply. If obstructions exist nearby, 

consult your Marley sales representative.

4  Minimum basin depth is 1'-6". Basin depth may vary to suit 

your storage requirements.

5  All anchor bolts complete with nut and washer must be 

furnished by others. Bolts must be 

3

4

" diameter with 1

1

2

all-thread projection.

6  Other contractors or purchaser must design, locate, 

construct, and furnish sump(s) and overflow(s) to suit 

requirements. The sump(s) should be designed according 

to the pump manufacturer’s recommendations. Other 

design sources: ANSI/HI specifications 1.1-1.5 for 

centrifugal pumps, 2.1-2.5 for vertical pumps, and 9.8 for 

pump intake design.

1'-6"  

1'-0 

RECOMMENDED 

OPERATING WATER LEVEL 

Section

Tower

Model

Dimensions

Operating Weight 

lb

A

W

L

Single Fan Cell

Each Cell Add

121-111

3

23'-6"

12'-0"

25200

21525

122-111

4

25'-6"

16'-0"

32280

28430

123-111

4

27'-6"

16'-0"

33300

29080

124-111

5

27'-6"

20'-0"

39230

35025

125-111

5

31'-6"

20'-0"

42800

37715

126-111

6

31'-6"

24'-0"

48780

43910

127-111

7

31'-6"

28'-0"

54830

50550

Summary of Contents for Marley Sigma Marley Sigma Steel

Page 1: ...Marley Sigma Steel CoolingTower Engineering Data Specifications...

Page 2: ......

Page 3: ...m 18 Casing 18 Access 18 Cold Water Collection Basin 19 Scope of Work 19 Specifications Options Control Options Control System 20 Basin Heater 21 Fan Motor Variable Speed Drive 21 Marley Premium VFD S...

Page 4: ......

Page 5: ...rt of the continuing better ment of this Marley product line The Sigma Steel is a galvanized steel field erected general purpose crossflow cooling tower designed to serve normal air conditioning and r...

Page 6: ...model indicates number of cells Change as appropriate for your selection Primary engineering data is per cell 3 Height shown is from base of tower columns to top of fan cylinder 4 Pumping head shown i...

Page 7: ...ain at least 2 0 of clear space at tower endwalls for construction purposes Air inlet faces must have unobstructed air supply If obstructions exist nearby consult your Marley sales representative 4 Op...

Page 8: ...r Marley sales representative 4 Minimum basin depth is 1 6 Basin depth may vary to suit your storage requirements 5 All anchor bolts complete with nut and washer must be furnished by others Bolts must...

Page 9: ...required 4 Marley piping terminates at face of a cast iron flat face flange Bolt circle conforms to class 125 lb ANSI B 16 1 specifications 5 Supports on tower for crossover piping are part of the tow...

Page 10: ...esigner must take care to provide generous air inlet paths and the tower s fan cylinder discharge height should not be lower than the elevation of the top of the enclosure Obtain a copy of Marley Tech...

Page 11: ...u money in the long run both on operation and on maintenance Here are two of the more popular options Two Speed Motors Two speed motors improve operating flexibility by increas ing the number of poten...

Page 12: ...ection that fits your space allot ment and whose power usage is acceptable Limitations on physical size and total operating horsepower avoid the introduction of unfore seen operational and site relate...

Page 13: ...ase is incapable of performing as specified then you will not have received full value for your money Bear in mind that the size and cost of a cooling tower varies directly with its true thermal capab...

Page 14: ...wind load and 5 g seismic load Framing joints shall be made with 1 2 diameter and larger Series 300 stainless steel machine bolts nuts and washers 3 4 Towers of more than one cell shall include galvan...

Page 15: ...surance that the tower can withstand long term operation in a hostile environment but that it will accept many years of inspection and maintenance traffic by your operating personnel Fiberglass reinfo...

Page 16: ...s a crossover pipe to deliver water to both sides of the tower 5 6 The mechanical equipment assembly shall be warranted for no less than five 5 years This warranty shall cover the fan s speed reducers...

Page 17: ...parate external louvers used by others permit water to escape the fill and form ice or produce an unsightly situation adjacent to the tower If you plan to use your tower in the wintertime particu larl...

Page 18: ...d steel shall also be provided 9 0 Access 9 1 There shall be a 33 wide by 61 high access door in each endwall casing to provide access to the interior of the tower Access doors shall be hinged and equ...

Page 19: ...be responsible for the design fabrica tion and delivery of materials to the project site and for the erection of the tower over supports provided by others Unless otherwise specified all external pipi...

Page 20: ...20VAC 50VA control power overload trip alarms and remote temperature control devices The temperature controller shall be adjustable for the required cold water temperature If a thermostatic controller...

Page 21: ...drive shafts The VFD shall catch a fan spinning in the reverse direction without tripping The panel shall include a main discon nect with short circuit protection and external operating handle lockabl...

Page 22: ...is no longer required The fluid cooler manu facturer shall supply VFD start up assis tance Tower vibration testing throughout the speed range is required to identify and lockout any natural frequency...

Page 23: ...assure proper gear box lubrication the VFD sys tem shall de energize the motor once 25 motor speed is reached and cool ing is no longer required The VFD shall include de icing logic with auto canceli...

Page 24: ...the ladder attached to the tower casing This extension shall be long enough to rise from the roof grade level to the base of the tower Anchorage and lateral bracing of the ladder extension shall be by...

Page 25: ...r Distribution System Section The distribution basins shall include galvanized steel covers These covers shall be designed for a uniform live load of 40 psf and shall be easily removable for maintenan...

Page 26: ...usually resolve these situations by using two speed motors in either 1800 900 or 1800 1200 RPM configuration and operating the fans at reduced speed without cycling after hours The natural nighttime r...

Page 27: ...n in the tower Refer to our Stainless Steel Sigma Series in which the use of stainless steel has been maximized Except for valve bodies and Geareducer every steel component of that product line is man...

Page 28: ...66213 UNITED STATES 913 664 7400 spxcooling spx com spxcooling com In the interest of technological progress all products are subject to design and or material change without notice 2008 SPX Cooling T...

Reviews: