Flying with a different GCS
If flying without Swift
, there are several complexities which must be taken into account when planning the mission.
Caution:
M ission planning these waypoints is critical to flight safety, if there is confusion about planning these items please
.
Caution:
removes many of its safety checks and requires the operator to perform and track the
preflight carefully. Swift Radioplanes, LLC (SRP Aero) is not responsible for any incidents that result from incorrect planning,
preflight, or flight operations.
Takeoff
A takeoff must be planned relative to home in order to ensure the aircraft transitions at the correct altitude. The following fields of the
mission item must be planned as specified below.
Field
Required Value
command
M AV_CM D_NAV_VTOL_TAKEOFF
frame
M AV_FRAM E_GLOBAL_RELATIVE_ALT
x
0
y
0
z
Altitude above home to takeoff to in meters
Landing
A
landing consists of a number of waypoints. If these are not all planned as specified then the aircraft may be unable to perform
failsafes, or may encounter terrain obstructions while flying the landing. The waypoints must be planned as specified below.
Field
Required Value
command
M AV_CM D_DO_LAND_START
x
Landing latitude in degrees * 10
y
Landing longitude in degrees * 10
Field
Required Value
command
M AV_CM D_NAV_LOITER_TIM E
param1
1
x
Landing latitude in degrees * 10
y
Landing longitude in degrees * 10
z
Approach altitude in meters (can be relative or global height according to the frame field)
7
7
7
7
Flying with other GCS's
162
Summary of Contents for Lynx VTOL
Page 6: ...Package Contents Package Contents 6...
Page 18: ...3 Right click on the USB Serial Port and select properties Getting Started 18...
Page 19: ...4 Swap to the Port Settings tab and select Advance Getting Started 19...
Page 86: ...Landing 86...
Page 87: ...Payloads Standard Mapping Payload Multispectral Mapping Payload Custom Payloads Payloads 87...
Page 94: ...Standard Mapping Payload 94...
Page 108: ...Mounting Custom Payloads 108...
Page 110: ...Post Processing Geo Tagging PPK Tagging Base Station Reference Stations Post Processing 110...
Page 114: ...Geo Tagging 114...
Page 130: ...Battery Charging Charging Storage Battery Management 130...
Page 136: ...Second Battery Start Charging 136...
Page 143: ...Second Battery Start Storage 143...
Page 149: ...Replacing the Main Propeller 149...
Page 167: ...Getting Logs 167...
Page 171: ...2019 02 11 Ensure the landing checklist matches the GCS landing checklist Manual Changelog 171...