background image

 

SS Heat puts its technical department at your disposal to advise you about the optimal size and 
location for your installation. 

 

Electrical requirements

 

• 

SS  Heat  panels  must  be  connected  to  an  electrical  circuit  for  each  area,  activated  by  a 
differential circuit breaker and protected by magneto-thermal switches at the control panel for 
the room. In the case of using multiple panels within a single area, it is recommended for them 

to  be  installed  in  two  lines,  each  of  them  supplying  power  to  alternating  panels  with  an 
independent magneto-thermal switch so that, if less power is required, only half the panels can 

be activated. 

• 

The energy source for the infrared panels is electricity. Please review this manual or the website 
to get to know the specifications of each of the panels. 

• 

Before  installation,  review  the  electrical  capacity  and  existing  consumption.  Capacity  will 
depend on the diameter of the electrical conductor and the internal wiring.  

• 

SS Heat recommends that you obtain advice from a certified electrical installer. 

• 

If necessary, it is recommended for you to define independent electrical circuits (this will depend 
on the number of heating panels and electricity requirements). 

• 

It is not recommended for the circuit to be shared with other electrical equipment. 

• 

Disconnection means must be incorporated into the wiring according to safety regulations. 

• 

The mains cable must comply with standard IEC 60245 66 and have a minimum thickness of 
2.5 mm. In the case of installing multiple plates connected to the same wire, its size must match 
the type of installation, following the instructions of the authorised installer. 

 
Precautions for the choice of location 

• 

The  SSH  panel  must  be  installed  more  than  2.5  metres  from  the  ground  and  at  least  40  cm 

away from the wall. 

• 

The SSH panel must be installed horizontally. 

• 

The SSH panel must be kept at a minimum distance of 100 cm from flammable products. 

• 

Please check cables and connection to the power supply before installation. 

• 

Do  not  install  the  thermostat  in  warm  and  humid  places.  (However,  the  thermostat  must  be 
placed close to the SSH panel installation). 

• 

The SSH panel must be installed with individual wiring as it is not convenient for the SSH panel 
and the switch to be installed in the same place. 

• 

Please  be  careful  not  to  contaminate  the  surface  of  the  SSH  panel  during  installation.  (Use 

appropriate clean gloves to handle the SSH panel). 

• 

Please  follow  the  instructions  in  the  manual  for  installation  or  consult  SS  HEAT  authorised 
installers. 

• 

The SSH panel should not be installed under a mains socket. 

• 

If you need to replace the wiring, contact the manufacturer, technical support or an authorised 
distributor. 

Summary of Contents for 60-120

Page 1: ...USER AND INSTALLATION GUIDE SSH INDOOR SERIES MODELS 60 150 60 120 60 90 60 60 Manual updated on 4 January 2016 THE EFFICIENT HEATING ...

Page 2: ...guide carefully for an appropriate installation and later use If you have any questions regarding the installation or use of the product please contact us through our website www ssheat co uk or directly through your distributor Thank you Thank you for purchasing SS Heat Products Our products have the highest certifications worldwide and are manufactured under the strictest quality standards ...

Page 3: ...lt in fire and explosions Do not place flammable substances near the SSH panel such as oils gas containers sprays etc o If these recommendations are not followed it may result in explosions or fire Do not strike the SSH panel o If you do not follow the instructions appropriately there may be some risks due to malfunction The panels are not designed to be used by children or ill people with limited...

Page 4: ...rmal switch must be used Misuse of the thermostat may result in accidents Storage Do not place heavy items on the SSH panel for storage as they may cause damage or malfunction of the SSH panel For storage do not stack more than 10 plates at the same time Keep stored plates away from moisture 2 User s guide and guarantee Components included in each box 4 X SS HEAT direct heat radiation plate 4 X Pl...

Page 5: ...y of the receipt The receipt must show the serial number SS Heat assumes no liability for any problems caused by power surges in the mains Damages caused to the plate caused by any of the following are expressly excluded from the guarantee Accidents fire liquids chemical products other substances flooding vibrations electrical overloads excessive or incorrect voltage radiation electrostatic discha...

Page 6: ...fast amortisation due to its low energy consumption It imitates the process used by the sun to heat the Earth emitting heat in the low range of the infrared spectrum between 4 and 14 nano meters Energy savings It increases available space as it does not require boilers radiators split units compressors or gas bottles Maximum energy efficiency Completely silent heating that generates no noise or vi...

Page 7: ... 8 x 2 1 8 60 90 SR 4 SMART 600 2 6 89 8 x 59 8 x 2 2 4 60 120SR 5 SMART 800 3 5 119 8 x 59 8 x 2 3 1 60 150SR 6 SMART 900 3 9 149 8 x 59 8 x 2 3 8 Surface installation Fitted installation 4 Installation ALL ELECTRICAL CONNECTIONS AND INSTALLATION MUST BE CARRIED OUT BY A COMPETENT AND CERTIFIED ELECTRICIAN IN ACCORDANCE WITH CURRENT LEGISLATION REGULATION ...

Page 8: ... be shared with other electrical equipment Disconnection means must be incorporated into the wiring according to safety regulations The mains cable must comply with standard IEC 60245 66 and have a minimum thickness of 2 5 mm In the case of installing multiple plates connected to the same wire its size must match the type of installation following the instructions of the authorised installer Preca...

Page 9: ...10 cm away from lighting systems The SSH panel must be kept at a minimum distance of 100 cm from flammable products Recommended plate locations Figure 1 Figure 2 In the bedroom you must prevent the greatest heat to be produced on the bed Therefore it is recommended for the plate to be installed at the foot of the bed as shown in figure 1 If it is installed as in figure 2 comfort will be reduced as...

Page 10: ...placed in the area that heat reaches directly Taking into account that the aperture angle of the area heated by each plate is of 40 degrees according to the example on a ceiling with a height of 3 metres and a distance between the plate and the wall of 150 cm the thermostat must be placed over 130 cm from the ground Thermostat T T T T T Thermostat SS HEAT Panel The installation of a thermostat in ...

Page 11: ...5 While disconnected from the mains connect the plate wires to the wires that connect the plate section on the ceiling to the thermostat 6 Cover the screw holes with the trim caps included in the box and clean the plate 7 Connect the wires to the thermostat or home automation system close the covers connect to the mains verify that the plates are working correctly and programme the thermostat see ...

Page 12: ...mart Sun Heat The supply of service and the performance described herein will depend on the specific conditions of each project The use or reproduction of this document in whole or in part is strictly prohibited for any other purpose To obtain authorisation for the use of this information or any additional clarification contact THE EFFICIENT HEATING SMART SUN HEAT Unit 4 Townley park industrial es...

Reviews: