3-1
2. INSTALLATION
2.1
Unpacking and Inspection
Prior to opening the shipping container, inspect it for damage or
evidence of mishandling. If it has been damaged or mishandled, notify
the carrier before opening the container. Once the container is opened,
inspect the contents for damage. Any damage should be reported to the
carrier immediately. Save the shipping container. Check the contents
against the packing list.
2.2 Location/Environment
The preferred environment for the Binary Solvent Delivery
Module is normal laboratory conditions. The area should be clean and
have a stable temperature and humidity. The specific temperature and
humidity conditions are 10 to 30 °C and 20% to 90% relative
humidity. The instrument should be located on a stable flat surface
with surrounding space for ventilation and the necessary electrical and
fluid connections.
2.3
Fluid Connections & Priming
There are only four connections to be made.
1.
Connect left drawer pump solvent line supplied
2.
Connect right drawer pump solvent line supplied
3.
Connect line to injection valve from outlet “T”
4. Next, install the self flush. Connect the self flush inlet and
outlet (opaque) tubing as shown on the the next page.
Details on the proper installation of tubing and priming of the
pump and self flush is shown on the next page.
Summary of Contents for BINARY SOLVENT DELIVERY MODULE
Page 2: ......