Operation, Installation and Maintenance Manual for 6018/11 - Series
ID-No.:
226765 / 6018605300
Publication Code: 2017-08-31:BA00.lll.en.02 Page - 17 - of 22
Note:
•
The required dust resistance!
•
The required temperature resistance!
•
The required temperature resistance!
•
The IP degree of protection according to the rating plate!
•
The required tightening torques!
•
The operating instructions of the cable glands and stopping plugs!
•
The range of the permissible cable diameter!
7.3.5
Complete Charging and discharging of NiCd battery
The Battery is not
charged fully when delivered. Hence, it must be charged at least for 25 Hours continuously for the first time and
charged up & discharged at least for 3 times to reach the full capacity.
On the device, a NiCd battery with a rated voltage of 6V (5 NiCd cells) is connected. The charging technology charges the battery with
a permanent charge current of 200 mA (C / 20 of the battery capacity).
To achieve the longest possible battery life, it is recommended to perform a complete discharge of the battery once a year.
It is recommended, a full discharge only be carried out with an ambient temperature of at least +10° C or higher.
8.
Commissioning
WARNING
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
Check the device before commissioning!
Explosion protection is impaired!
•
Comply with the National regulations.
•
Check the device for proper installation and function before commissioning.
NOTE
Condensation
due to specific environmental and operating conditions condensation cannot be avoided completely.
•
Operate the luminaire continuously or periodically over extended periods of time!
•
Avoid thermal bridges!
Care to be taken with Battery
•
To avoid
Deep-Discharge
of the Battery, disconnected the battery from the supply, through the connector provided in the battery
compartment, when the light fixture is not in use for a period longer than four weeks.
•
DO NOT FORGET TO CONNECT THE BATTERY TO THE ELECTRICAL CIRCUIT BEFORE SWITCHING ON THE
LUMINIARE.
Before commissioning, ensure that:
•
the device has been installed according to regulations.
•
the power supply voltage and the rated operational voltage are identical.
•
the required cable diameter for cable glands has been used.
•
the cable entries and stopping plugs have been securely tightened.
•
the cables are correctly connected.
•
the connection has been performed correctly.
•
all screws and nuts are tightened according to regulations.
•
the connection chamber is clean.
•
the device is not damaged.